Architecture review checklist: what a critical-path review must produce before you staff the work

A proposed exit-criteria checklist for reviewing a critical-path architecture: a named SLI and SLO target, stated overload behavior, a tested restore path, and idempotent retry evidence, each with an owner and date before staffing is approved.

Engineers in a war room at night
The short answer

Before you staff the work, the review should produce a one-page table naming each critical-path failure mode with the evidence that answers it: a quantitative SLI with an SLO target, stated overload behavior, a tested base-backup-plus-WAL restore, and idempotent retry semantics. Approve staffing only when every failure mode has evidence or a named owner and date.

What the review must produce

An architecture review is done when it names the failure modes on your critical path, the evidence that answers each one, and the decision that evidence informs. A diagram alone does not record whether an operation is safe to retry, how overload is isolated, or whether a restore has ever been tested. This page proposes a checklist built from four documented mechanisms; it is a diligence method we propose, not a published review standard.

A named SLI and an SLO target

The Google SRE Book states that it is impossible to manage a service correctly, let alone well, without understanding which behaviors really matter for that service and how to measure and evaluate them. It defines a service level indicator as a carefully defined quantitative measure of some aspect of the level of service provided, and a service level objective as a target value or range of values for a service level measured by that indicator. The book gives a concrete form: an objective such as returning search results with average request latency under 100 milliseconds.

The review item is therefore specific: the critical path must have a named SLI, such as availability expressed as the fraction of well-formed requests that succeed, or request latency, and a written SLO target. The SRE Book notes that availability is often defined as the fraction of well-formed requests that succeed, and that the industry expresses high availability in "nines," with the published Google Compute Engine target cited as 99.95 percent. If the review cannot name the indicator and the target, that is a gap with an owner, not a reason to stop all work.

Stated overload behavior

The Google SRE Book chapter on handling overload states that no matter how efficient a load balancing policy is, eventually some part of the system will become overloaded, and that gracefully handling overload is fundamental to running a reliable serving system. The chapter also warns that modeling capacity as queries per second often makes for a poor metric, and that a better solution is to measure capacity directly in available resources, such as CPU cores and memory reserved for the service.

The review should record what the critical path does when it is overloaded: serve degraded responses, redirect, or return errors, and how a misbehaving caller is isolated. The chapter states that when global overload occurs, it is vital that the service deliver error responses only to misbehaving customers while other customers remain unaffected. As a proposal, we suggest the review ask for a written answer describing what the service does at load beyond its measured capacity; the SRE Book does not prescribe a specific load multiple as a test threshold. A review with no written answer to that question has an evidence gap, and the gap should carry an owner and a date.

A tested restore path

PostgreSQL's documentation on continuous archiving and point-in-time recovery describes the mechanism the review should verify in a PostgreSQL deployment: combine a file-system-level backup with backup of the write-ahead log, and on recovery restore the file system backup and then replay the archived WAL files. The documentation states this supports point-in-time recovery, meaning the database can be restored to its state at any time since the base backup was taken, and that a continuous feed of WAL files to a second machine loaded with the same base backup yields a warm standby.

Two cautions from the same documentation matter for the review. First, pg_dump and pg_dumpall produce logical dumps and cannot be used as part of a continuous-archiving solution, because they do not contain enough information for WAL replay; a review that lists a nightly dump as the recovery plan for a PostgreSQL database that needs point-in-time recovery has not answered the question. Second, the documentation says you should set up and test your procedure for archiving WAL files before you take your first base backup. The documentation supports testing the archiving procedure in that order; as our own proposal, we additionally suggest the review ask for the date and output of a rehearsed restore, since a backup job that has never been restored is not evidence of a recovery path.

Retry side effects and idempotency

The Amazon Builders' Library article on idempotent APIs states that retrying a service call as mitigation for a transient fault rests on a simplifying assumption: that the operation can be retried without side effects. The goal is that the result of the call happens only once even if the call is made multiple times. In its EC2 RunInstances example, a provisioning process that receives no response cannot tell whether a singleton workload is running, and simply retrying could result in multiple workloads; the article calls the reconciliation needed to compensate for this heavy lifting.

The article states that to allow callers to retry these kinds of operations, the operations need to be made idempotent. The review should therefore record, for each critical-path call that a client or a controlling process may retry, whether the operation is idempotent and what evidence supports that claim, such as an idempotency key or a deduplication mechanism. A retry-on-timeout policy with no side-effect analysis is a failure mode with no evidence.

The one-page exit-criteria table

We propose the review output as one page with a row per failure mode and five columns: failure mode, evidence, decision, owner, and date. The four evidence categories above, a measurable service target, overload isolation behavior, a tested recovery path, and retry side-effect control, are a minimum set for the critical path; the sources support these categories as mechanisms, not as a complete review standard, and cost, security, compliance, and team skills are outside what they cover.

We also propose that the decision column take one of four values: accept, remediate before launch, staff a workstream, or defer with owner and date. Missing evidence is recorded as a decision item with an owner and a date, not treated as a reason to halt everything. The rule we propose: approve staffing only when each critical-path failure mode has evidence or an explicit owner and date attached to producing it.

Who runs the work once you approve it

Once the review produces gaps, the staffing question is who directs the work, who stands behind delivery quality, how it is priced, and how it ends. With developers in your team, our engineers join your standups, tools, and repositories and take direction from your engineering manager, so your side directs the work and reviews its output; Atom stands behind the engineers' work, paying, managing, and replacing them under contract. Each developer is priced separately per month for about 160 hours: mid at $7,000, senior at $9,500, senior data/AI at $11,500, lead at $12,500, and QA automation at $6,500. After a 3-month initial term, ending a developer takes 30 days' notice.

With a managed team, our tech lead directs the work, talking with you every day and turning your priorities into a plan, and Atom owns code review, quality, and releases. Teams are priced per month: Starter at $29,500, Core at $44,500, and Plus at $67,500, with an engineer added to a managed team at $10,900 senior or $8,000 mid. The initial term is 3 months; after that, removing one person takes 30 days' notice and ending the team takes 60 days. If nobody on your side is free to review code and plan releases, buy the tech lead, not just the seats. If you have no written scope at all, the Blueprint is a two-week, fixed-price $7,500 engagement delivering the scope, architecture, milestone plan, team plan, and a fixed monthly quote; it is not credited toward a team.

The checklist

  1. Name the critical path's SLI in writing, for example availability as the fraction of well-formed requests that succeed, or request latency.
  2. Attach a numeric SLO target to that indicator, and confirm the indicator is measured, not aspirational.
  3. Record what the service does under overload: degraded responses, redirects, or errors, and which one applies at what load.
  4. Check that overload isolation exists so a misbehaving caller receives errors while other customers remain unaffected.
  5. Verify capacity is modeled in resources such as CPU and memory, not only in queries per second.
  6. If you run PostgreSQL and need point-in-time recovery, confirm the recovery plan uses a base backup plus WAL archiving, not a logical dump.
  7. For PostgreSQL, check that WAL archiving was set up and tested before the first base backup, following the ordering the PostgreSQL documentation recommends; for another database, verify the equivalent in its own documentation.
  8. As a proposal, find the date and output of the last rehearsed restore; a backup job that has never been restored is not evidence of a recovery path.
  9. List every critical-path call a client or controlling process may retry, and mark each as idempotent or not.
  10. For each retried call, identify the mechanism that makes the result happen only once, such as an idempotency key.
  11. Check for retry loops that could create duplicate resources, the multiple-workloads case the Amazon Builders' Library describes.
  12. Write the one-page table with a row per failure mode and columns for evidence, decision, owner, and date.
  13. Confirm every row has either evidence or an owner and date; any row with neither is the review's first output.
  14. Record the decision per row as accept, remediate before launch, staff a workstream, or defer with owner and date.
  15. Decide who directs the remediation work: your engineering manager with developers in your team, or our tech lead with a managed team.
  16. As a proposal, confirm the staffing choice matches the ownership gap: if nobody on your side reviews code and plans releases, the review should point to a managed team.

Questions

How long should this review take?

The sources do not prescribe a duration. As a proposal, the four evidence questions are answerable in one or two working sessions if the metrics, backup, and retry behavior already exist; each unanswered question becomes an owner-and-date item rather than a blocker.

What does it cost to close the gaps the review finds?

That depends on the gaps. If the fix is engineering work, a managed team is priced at $29,500 per month for Starter, $44,500 for Core, or $67,500 for Plus, with an added engineer at $10,900 senior or $8,000 mid. Developers in your team are priced per developer per month: $7,000 mid, $9,500 senior, $11,500 senior data/AI, $12,500 lead, and $6,500 QA automation. The review itself is a document you produce with your own engineers.

Does this checklist apply if we do not run PostgreSQL?

The restore item is written from PostgreSQL's documentation, which describes its own WAL archiving and point-in-time recovery. As a proposal, we suggest checking whether your database offers an equivalent tested restore to a point in time, but whether that is the right or available recovery model for another database is something you would verify in that database's own documentation, not something the PostgreSQL documentation establishes.

What if our critical path has no SLI or SLO today?

Then the review has found its first gap. The SRE Book's position is that you cannot manage the service correctly without understanding which behaviors matter and how to measure and evaluate them, so the decision column would read remediate before launch or staff a workstream, with an owner and a date for defining the indicator and target.

Is this a standard we can cite to our auditors?

No. The four sources are technical documentation from Google's SRE Book, PostgreSQL, and the Amazon Builders' Library, not architecture-review standards. The table, columns, and decision rule are our proposal for a diligence method.